Aibinu, A A and Odeyinka, H A (2006) Construction Delays and Their Causative Factors in Nigeria. Journal of Construction Engineering and Management, 132(07), 667–77.

Brilakis, I and Soibelman, L (2006) Multimodal Image Retrieval from Construction Databases and Model-Based Systems. Journal of Construction Engineering and Management, 132(07), 777–85.

Caldas, C H, Torrent, D G and Haas, C T (2006) Using Global Positioning System to Improve Materials-Locating Processes on Industrial Projects. Journal of Construction Engineering and Management, 132(07), 741–9.

Galloway, P D (2006) Comparative Study of University Courses on Critical-Path Method Scheduling. Journal of Construction Engineering and Management, 132(07), 712–22.

Galloway, P D (2006) Survey of the Construction Industry Relative to the Use of CPM Scheduling for Construction Projects. Journal of Construction Engineering and Management, 132(07), 697–711.

Ho, S P (2006) Model for Financial Renegotiation in Public-Private Partnership Projects and Its Policy Implications: Game Theoretic View. Journal of Construction Engineering and Management, 132(07), 678–88.

  • Type: Journal Article
  • Keywords: Partnerships; Procurement; Contracts; Financial management; Contract management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(678)
  • Abstract:
    Today, government is no longer considered the sole provider of public works or services. Public-private partnership (PPP) has been recognized as an important approach to solving problems for governments in providing infrastructure systems. However, the joint ownership or partnership in PPP complicates the administration of PPP projects. Too often, in PPP, many serious problems occur mainly because of bad administration policies. In particular, the fact that government may rescue a distressed project and renegotiate with the developer causes major problems in project procurement and management. This paper aims to study when and how government will rescue a distressed project and what impacts government’s rescue behavior has on project procurement and management. A game-theory based model for government rescue dynamics is developed. Propositions, corollaries, and important policy implications are then derived from the model. This pilot study, the writer hopes, may provide theoretic foundations to policy makers for prescribing effective PPP procurement and management policies and for examining the quality of PPP policies. The study can also offer researchers a framework and a methodology to understand the behavioral dynamics of the parties in PPP.

Lædre, O, Austeng, K, Haugen, T I and Klakegg, O J (2006) Procurement Routes in Public Building and Construction Projects. Journal of Construction Engineering and Management, 132(07), 689–96.

Lowe, D J, Emsley, M W and Harding, A (2006) Predicting Construction Cost Using Multiple Regression Techniques. Journal of Construction Engineering and Management, 132(07), 750–8.

Lucko, G, Anderson-Cook, C M and Vorster, M C (2006) Statistical Considerations for Predicting Residual Value of Heavy Equipment. Journal of Construction Engineering and Management, 132(07), 723–32.

Mullens, M A and Arif, M (2006) Structural Insulated Panels: Impact on the Residential Construction Process. Journal of Construction Engineering and Management, 132(07), 786–94.

Navon, R and Kolton, O (2006) Model for Automated Monitoring of Fall Hazards in Building Construction. Journal of Construction Engineering and Management, 132(07), 733–40.

Reinschmidt, K and Trejo, D (2006) Economic Value of Building Faster. Journal of Construction Engineering and Management, 132(07), 759–66.

Rezgui, Y and Zarli, A (2006) Paving the Way to the Vision of Digital Construction: A Strategic Roadmap. Journal of Construction Engineering and Management, 132(07), 767–76.